Nexus Materials(placeholder name) — prototype

Seeded from MM Tracker Example TaylorWimpey.xlsx (Taylor Wimpey North Yorkshire, tracker updated 5 Jun 2026). Local JSON only — nothing is saved, no integrations are live.

Opportunities

The pipeline: every route someone has engaged, from identified to converted. Follow-ups and stalls surface themselves — the spreadsheet never could.

Mocked for the prototype
Alerting as atPrototype control — the seeded exemptions expire May 2028.

Open

0

Active and within the 14-day stall window

Stalled

5

No event in 14 days or more

Follow-ups

1

Presented and unanswered for 14 days or more — the follow-up list the team currently works by hand.

Converted

1

Routes run — the pattern to repeat

Volume covered

107,689 m³

Across 7 mock opportunities · as at 6 Oct 2026

Filters
Show
Search

Showing 7 of 7 opportunities · 1 on the group follow-up list. Sorted follow-ups first, then quietest longest.

StageSiteRoute & counterpartyTierVolumeAssessmentNext actionLast event
PresentedstalledFollow up
Propsect Farm

Topsoil export

Site to site

Highfield Farm (own division)

Verified8,528m³CVL

Confirm Highfield earthworks programme with technical team

James · due 25 Aug 2026

63d ago
Convertedconverted
West Lane, Ripon

Subsoil export

Site to site

Cat Flatt (own division)

Golden23,933m³CVL—110d ago
Closedclosed
Wynyard Area 3

Subsoil export

Off-platform supplier

Regional earthworks contractor · off platform

Potential9,000m³CVL—106d ago
Identifiedstalled
Marske Sands

Topsoil export

Restoration

Former sand quarry restoration scheme · off platform

Potential45,100m³CVL

Contact operator re permit conditions and gate fee

James

63d ago
Identifiedstalled
Romanby Grange

Topsoil export

Restoration

Quarry restoration scheme, Thirsk · off platform

Potential17,839m³CVL—63d ago
In discussionstalled
Bishops Vale

Subsoil export

Recycling

Off-site inert recovery · off platform

Verified1,150m³CVL

Get gate fee in writing for the remaining balance

George · due 22 Aug 2026

62d ago
Qualifiedstalled
Marske Sands

Topsoil export

Site to site

Norton Lodge (own division)

Potential2,139m³CVL

Request chemical testing results for Marske Sands arisings

George · due 28 Aug 2026

56d ago

Presented and unanswered for 14 days or more — the follow-up list the team currently works by hand. Routes engaged from the Options page appear here as “Local” — Engagement is local-only in the prototype — it pins the route to the pipeline on this device. Nothing is sent or saved anywhere else.