Material lines
Required volume is the earthworks position; imported and exported are movements recorded to date.
- Required
- -11,200
- Imported
- 0
- Exported
- 11,200
- Outstanding
- 0
- Required
- -2,000
- Imported
- 0
- Exported
- 2,000
- Outstanding
- 0
Opportunities
0 opportunitiesRoute plans someone has engaged for this site's outstanding balances — from identified to converted.
No opportunities mapped for this site yet.
Compliance
U1 exemption register and MMP / DoWCoP status. Pulled from Nexus Assurance where the client uses it; entered here otherwise.
DoWCoP verification report not received
MMP 2563_2 issued by Lithos; verification outstanding.
No U1 exemption on the register for this site. If material is being re-used on site under an exemption, it is not recorded here — the spreadsheet's silent failure mode.
- Consultant
- Lithos
- MMP issue no.
- 2563_2
- DoWCoP verification received
- No
- DoWCoP reference
- Berrymead Farm, Darlington
- Site activities impacting MMP
- No
Budget & risk
Visible to Taylor Wimpey + Nexus onlyBudgeted rate per m³ and computed exposure against the outstanding balance. Budgeted rates are ring-fenced to the client and Nexus. They never appear in cross-client output, benchmarks or shared fixtures.
£ ——.——
per m³, muck-away
£ ——.——
per m³, delivered
£ ———,———
rate × 0 m³ outstanding
Comments & actions
- Multiple contractors, consortium muck, 1000m3 tw responsibility - import no longer required
Carried straight from the tracker's comments column — this is where the division's open actions actually live.